All 168 sites in Algeria

Site Plumes, last 12 months Largest detected rate Last seen Likely operator
DZA_S_012Gas disposal facility 36464 total 10,437 kg/h 12 Oct 2024 Sonatrach Plausible
DZA_S_018Flare 28111 total 18,550 kg/h 3 Apr 2025 Sonatrach Plausible
DZA_S_109Gas disposal facility 2142 total 2,435 kg/h 13 Nov 2024 Sonatrach Plausible
DZA_S_010Flare 1940 total 6,165 kg/h 27 Jan 2025 Sonatrach Plausible
DZA_S_152Gas disposal facility 1414 total 3,365 kg/h 17 Apr 2025 Sonatrach Plausible
DZA_S_204Gas disposal facility 1313 total 2,579 kg/h 3 Jul 2025 Sonatrach Plausible
DZA_S_222Gas disposal facility 1220 total 3,265 kg/h 12 Jan 2025 Sonatrach Plausible
DZA_S_050Gas disposal facility 1130 total 6,811 kg/h 8 Jul 2025 Sonatrach Plausible
DZA_S_098Flare 1011 total 7,574 kg/h 18 Jun 2025 Sonatrach Plausible
DZA_S_070Gas disposal facility 935 total 5,647 kg/h 3 Dec 2024 Sonatrach Plausible
DZA_S_008Flare · Persistent 921 total 3,890 kg/h 22 Aug 2024 Sonatrach Plausible
DZA_S_013Flare 815 total 3,529 kg/h 19 Sep 2024 Sonatrach Plausible
DZA_S_220Flare · Persistent 88 total 2,454 kg/h 3 Dec 2024 Sonatrach Plausible
DZA_S_020Flare 737 total 8,793 kg/h 29 May 2025 Sonatrach Plausible
DZA_S_015Gas disposal facility 710 total 2,181 kg/h 24 Dec 2024 Sonatrach Plausible
DZA_S_031Flare 631 total 4,912 kg/h 25 Dec 2024 Sonatrach Plausible
DZA_S_110Gas disposal facility 611 total 1,472 kg/h 25 Nov 2024 Sonatrach Plausible
DZA_S_019Flare 514 total 4,873 kg/h 10 Feb 2025 Sonatrach Plausible
DZA_S_077Gas disposal facility 59 total 1,737 kg/h 3 Dec 2024 Sonatrach Plausible
DZA_S_060Flare 57 total 3,230 kg/h 10 Jul 2025 Sonatrach Plausible
DZA_S_101Flare 55 total 3,971 kg/h 26 Apr 2025 Sonatrach Plausible
DZA_S_108Flare 55 total 3,622 kg/h 3 Apr 2025 Sonatrach Plausible
DZA_S_120Gas disposal facility 55 total 2,596 kg/h 24 Dec 2024 Sonatrach Plausible
DZA_S_016Landfill 412 total 6,818 kg/h 22 Apr 2025 Not yet attributed
DZA_S_125Gas disposal facility 44 total 6,238 kg/h 13 Jun 2025 Sonatrach Plausible
DZA_S_003Gas disposal facility 44 total 3,859 kg/h 8 Jun 2025 Sonatrach Plausible
DZA_S_135Gas disposal facility 44 total 5,148 kg/h 14 Feb 2025 Sonatrach Plausible
DZA_S_036Flare 326 total 11,844 kg/h 5 Aug 2024 Sonatrach Plausible
DZA_S_030Flare 316 total 6,774 kg/h 29 Sep 2024 Sonatrach Plausible
DZA_S_100Flare 35 total 8,988 kg/h 16 Sep 2024 Sonatrach Plausible
DZA_S_014Gas disposal facility 34 total 3,020 kg/h 23 Jan 2025 Sonatrach Plausible
DZA_S_205O&G facility (generic) 33 total 2,432 kg/h 15 Jun 2025 Sonatrach Plausible
DZA_S_168Gas disposal facility 33 total 4,665 kg/h 27 Apr 2025 Sonatrach Plausible
DZA_S_113Gas disposal facility 33 total 10,591 kg/h 26 Mar 2025 Sonatrach Plausible
DZA_S_124Gas disposal facility 33 total 7,204 kg/h 31 Jan 2025 Sonatrach Plausible
DZA_S_219Gas disposal facility 33 total 7,781 kg/h 8 Nov 2024 Sonatrach Plausible
DZA_S_114Gas disposal facility 33 total 5,138 kg/h 6 Oct 2024 Sonatrach Plausible
DZA_S_005Flare 220 total 21,733 kg/h 19 May 2025 Sonatrach Plausible
DZA_S_059Landfill 210 total 3,943 kg/h 6 Oct 2024 Not yet attributed
DZA_S_021Chemical plant component 25 total 7,869 kg/h 14 Aug 2024 Sonatrach Plausible
DZA_S_022Gas disposal facility 24 total 4,029 kg/h 23 Apr 2025 Sonatrach Plausible
DZA_S_023O&G facility (generic) 24 total 4,528 kg/h 22 Apr 2025 Sonatrach Plausible
DZA_S_137Pit 24 total 1,338 kg/h 12 Feb 2025 Sonatrach Plausible
DZA_S_155Gas disposal facility 23 total 9,919 kg/h 17 Apr 2025 Sonatrach Plausible
DZA_S_209Gas disposal facility 22 total 2,121 kg/h 19 Jun 2025 Sonatrach Plausible
DZA_S_215Gas disposal facility 22 total 3,084 kg/h 17 Jun 2025 Sonatrach Plausible
DZA_S_198Gas disposal facility 22 total 4,458 kg/h 17 Jun 2025 Sonatrach Plausible
DZA_S_213Gas disposal facility 22 total 3,534 kg/h 15 Jun 2025 Sonatrach Plausible
DZA_S_199Gas disposal facility 22 total 2,586 kg/h 14 Jun 2025 Sonatrach Plausible
DZA_S_208Gas disposal facility 22 total 1,900 kg/h 9 Jun 2025 Sonatrach Plausible
DZA_S_203Well pad 22 total 8,110 kg/h 1 Jun 2025 Sonatrach Plausible
DZA_S_115Gas disposal facility 22 total 2,902 kg/h 8 Apr 2025 Sonatrach Plausible
DZA_S_116Flare 22 total 634 kg/h 19 Dec 2024 Sonatrach Plausible
DZA_S_119Gas disposal facility 22 total 5,508 kg/h 16 Dec 2024 Sonatrach Plausible
DZA_S_118Gas disposal facility 22 total 4,702 kg/h 6 Dec 2024 Sonatrach Plausible
DZA_S_043Gas disposal facility · Frequent 118 total 14,491 kg/h 6 Oct 2024 Sonatrach Plausible
DZA_S_011Pit 111 total 10,545 kg/h 6 Oct 2024 Sonatrach Plausible
DZA_S_074Gas disposal facility 19 total 1,478 kg/h 5 Oct 2024 Sonatrach Plausible
DZA_S_054Gas disposal facility 18 total 8,168 kg/h 22 Jul 2024 Sonatrach Plausible
DZA_S_053Flare 15 total 3,036 kg/h 12 Feb 2025 Sonatrach Plausible
DZA_S_027Flare 14 total 7,597 kg/h 18 Apr 2025 Sonatrach Plausible
DZA_S_025Flare 14 total 6,592 kg/h 3 Apr 2025 Sonatrach Plausible
DZA_S_039Gathering and boosting facilities 14 total 5,355 kg/h 27 Jan 2025 Sonatrach Plausible
DZA_S_026Landfill · Persistent 13 total 16,013 kg/h 24 Jul 2024 Not yet attributed
DZA_S_076Gas disposal facility 12 total 1,866 kg/h 25 May 2025 Sonatrach Plausible
DZA_S_096Gas disposal facility 12 total 5,807 kg/h 1 Feb 2025 Sonatrach Plausible
DZA_S_040Gas disposal facility 12 total 5,491 kg/h 14 Nov 2024 Sonatrach Plausible
DZA_S_216Gas disposal facility 11 total 4,571 kg/h 29 Jun 2025 Sonatrach Plausible
DZA_S_214Gas disposal facility 11 total 5,005 kg/h 15 Jun 2025 Sonatrach Plausible
DZA_S_207Gas disposal facility 11 total 2,111 kg/h 11 Jun 2025 Sonatrach Plausible
DZA_S_210Gas disposal facility 11 total 7,829 kg/h 7 Jun 2025 Sonatrach Plausible
DZA_S_211Gas disposal facility 11 total 1,477 kg/h 7 Jun 2025 Sonatrach Plausible
DZA_S_197Transmission Pipelines 11 total 2,380 kg/h 19 May 2025 Sonatrach Plausible
DZA_S_196Gas disposal facility 11 total 1,574 kg/h 19 May 2025 Sonatrach Plausible
DZA_S_181Gas disposal facility 11 total 7,865 kg/h 17 May 2025 Sonatrach Plausible
DZA_S_154Gas disposal facility 11 total 2,844 kg/h 12 Apr 2025 Sonatrach Plausible
DZA_S_151Oil & gas 11 total 535 kg/h 16 Mar 2025 Sonatrach Plausible
DZA_S_141Gas disposal facility 11 total 3,989 kg/h 12 Feb 2025 Sonatrach Plausible
DZA_S_133Gas disposal facility 11 total 2,009 kg/h 12 Feb 2025 Sonatrach Plausible
DZA_S_134Gas disposal facility 11 total 1,211 kg/h 12 Feb 2025 Sonatrach Plausible
DZA_S_140Gas disposal facility 11 total 3,882 kg/h 12 Feb 2025 Sonatrach Plausible
DZA_S_123Gas disposal facility 11 total 7,274 kg/h 23 Jan 2025 Sonatrach Plausible
DZA_S_221Gas disposal facility 11 total 9,255 kg/h 10 Jan 2025 Sonatrach Plausible
DZA_S_150Oil & gas 11 total 4,021 kg/h 30 Dec 2024 Sonatrach Plausible
DZA_S_121Pit 11 total 642 kg/h 23 Dec 2024 Sonatrach Plausible
DZA_S_131Gas disposal facility 11 total 1,007 kg/h 19 Dec 2024 Sonatrach Plausible
DZA_S_111Gas disposal facility 11 total 2,453 kg/h 6 Nov 2024 Sonatrach Plausible
DZA_S_112Gas disposal facility 11 total 2,967 kg/h 31 Oct 2024 Sonatrach Plausible
DZA_S_107Flare 11 total 737 kg/h 22 Oct 2024 Sonatrach Plausible
DZA_S_105Gas disposal facility 11 total 1,472 kg/h 15 Oct 2024 Sonatrach Plausible
DZA_S_106Gas disposal facility 11 total 1,290 kg/h 15 Oct 2024 Sonatrach Plausible
DZA_S_103Gas disposal facility 11 total 7,912 kg/h 29 Sep 2024 Sonatrach Plausible
DZA_S_176Transmission Pipelines 11 total 1,456 kg/h 18 Aug 2024 Sonatrach Plausible
DZA_S_175Transmission Pipelines 11 total 1,209 kg/h 18 Aug 2024 Sonatrach Plausible
DZA_S_017Transmission Pipelines 11 total 3,156 kg/h 6 Aug 2024 Sonatrach Plausible
DZA_S_009Gas disposal facility 11 total 2,718 kg/h 21 Jul 2024 Sonatrach Plausible
DZA_S_200Gas disposal facility 11 total 1,700 kg/h 21 Jul 2024 Sonatrach Plausible
DZA_S_218Flare 07 total 3,408 kg/h 9 May 2024 Sonatrach Plausible
DZA_S_080Pipeline 07 total 1,961 kg/h 26 Feb 2024 Sonatrach Plausible
DZA_S_174Gas disposal facility 07 total 6,708 kg/h 3 Sep 2021 Sonatrach Plausible
DZA_S_028Flare 06 total 7,760 kg/h 14 Feb 2024 Sonatrach Plausible
DZA_S_172Tank batteries 06 total 8,500 kg/h 21 Oct 2021 Sonatrach Plausible
DZA_S_079Gas disposal facility 05 total 4,800 kg/h 20 Apr 2024 Sonatrach Plausible
DZA_S_049Pit 05 total 14,312 kg/h 29 Jun 2023 Sonatrach Plausible
DZA_S_085Gas disposal facility 05 total 1,689 kg/h 26 Jun 2023 Sonatrach Plausible
DZA_S_063Gas disposal facility · Frequent 04 total 2,927 kg/h 14 Feb 2024 Sonatrach Plausible
DZA_S_082Gas disposal facility 04 total 2,609 kg/h 2 Feb 2024 Sonatrach Plausible
DZA_S_062Pit 04 total 4,010 kg/h 10 Oct 2023 Sonatrach Plausible
DZA_S_097Gathering and boosting facilities 04 total 4,221 kg/h 22 Sep 2023 Sonatrach Plausible
DZA_S_037Transmission Pipelines 04 total 17,440 kg/h 31 Aug 2023 Sonatrach Plausible
DZA_S_064Gas disposal facility 04 total 3,535 kg/h 26 Aug 2023 Sonatrach Plausible
DZA_S_191Transmission Pipelines 04 total 2,808 kg/h 3 Apr 2023 Sonatrach Plausible
DZA_S_167Flare 04 total 3,140 kg/h 14 Dec 2022 Sonatrach Plausible
DZA_S_072Gas disposal facility 03 total 2,929 kg/h 4 Apr 2024 Sonatrach Plausible
DZA_S_088Gas disposal facility 03 total 5,952 kg/h 5 Jan 2024 Sonatrach Plausible
DZA_S_038Gas disposal facility 03 total 7,892 kg/h 18 Aug 2023 Sonatrach Plausible
DZA_S_058Gas disposal facility 03 total 5,138 kg/h 12 Jun 2023 Sonatrach Plausible
DZA_S_083Flare 03 total 1,639 kg/h 3 Apr 2023 Sonatrach Plausible
DZA_S_102O&G facility (generic) 03 total 4,006 kg/h 30 Sep 2021 Sonatrach Plausible
DZA_S_201Pit 02 total 5,059 kg/h 30 Jun 2024 Sonatrach Plausible
DZA_S_024Landfill · Persistent 02 total 27,716 kg/h 12 Jun 2024 Not yet attributed
DZA_S_001Flare 02 total 2,523 kg/h 7 Jun 2024 Sonatrach Plausible
DZA_S_034Gas disposal facility 02 total 7,865 kg/h 20 Apr 2024 Sonatrach Plausible
DZA_S_090Gas disposal facility 02 total 5,396 kg/h 4 Apr 2024 Sonatrach Plausible
DZA_S_084Gas disposal facility 02 total 7,346 kg/h 31 Mar 2024 Sonatrach Plausible
DZA_S_035Transmission Pipelines 02 total 1,030 kg/h 3 Feb 2024 Sonatrach Plausible
DZA_S_073Gas disposal facility 02 total 6,259 kg/h 4 Jan 2024 Sonatrach Plausible
DZA_S_065Gas disposal facility 02 total 1,253 kg/h 26 Aug 2023 Sonatrach Plausible
DZA_S_091Gas disposal facility 02 total 4,830 kg/h 22 Jun 2023 Sonatrach Plausible
DZA_S_032Transmission Pipelines 01 total 1,758 kg/h 4 May 2024 Sonatrach Plausible
DZA_S_044Gas disposal facility 01 total 2,813 kg/h 29 Apr 2024 Sonatrach Plausible
DZA_S_087Gas disposal facility 01 total 4,452 kg/h 4 Apr 2024 Sonatrach Plausible
DZA_S_069Gas disposal facility 01 total 1,652 kg/h 31 Mar 2024 Sonatrach Plausible
DZA_S_041Gas disposal facility 01 total 20,155 kg/h 26 Feb 2024 Sonatrach Plausible
DZA_S_042Pit 01 total 2,459 kg/h 26 Feb 2024 Sonatrach Plausible
DZA_S_006Distribution Grid 01 total 5,094 kg/h 2 Feb 2024 Sonatrach Plausible
DZA_S_048Transmission Pipelines 01 total 12,263 kg/h 6 Dec 2023 Sonatrach Plausible
DZA_S_033Flare 01 total 1,630 kg/h 4 Dec 2023 Sonatrach Plausible
DZA_S_068Flare 01 total 1,252 kg/h 29 Nov 2023 Sonatrach Plausible
DZA_S_055Transmission Pipelines 01 total 3,619 kg/h 9 Nov 2023 Sonatrach Plausible
DZA_S_057Gas disposal facility 01 total 3,299 kg/h 7 Oct 2023 Sonatrach Plausible
DZA_S_095Gas disposal facility 01 total 7,063 kg/h 30 Sep 2023 Sonatrach Plausible
DZA_S_078Gas disposal facility 01 total 353 kg/h 25 Sep 2023 Sonatrach Plausible
DZA_S_075Pit 01 total 1,341 kg/h 26 Aug 2023 Sonatrach Plausible
DZA_S_066Gas disposal facility 01 total 1,904 kg/h 29 Jul 2023 Sonatrach Plausible
DZA_S_178Flare 01 total 852 kg/h 26 Jun 2023 Sonatrach Plausible
DZA_S_071Gas disposal facility 01 total 674 kg/h 26 Jun 2023 Sonatrach Plausible
DZA_S_061Flare 01 total 13,949 kg/h 22 Jun 2023 Sonatrach Plausible
DZA_S_093Gas disposal facility 01 total 7,675 kg/h 7 Jun 2023 Sonatrach Plausible
DZA_S_067Gas disposal facility 01 total 8,721 kg/h 6 Jun 2023 Sonatrach Plausible
DZA_S_104Flare 01 total 5,256 kg/h 5 May 2023 Sonatrach Plausible
DZA_S_092Gas disposal facility 01 total 2,930 kg/h 23 Apr 2023 Sonatrach Plausible
DZA_S_052Gas disposal facility 01 total 2,049 kg/h 12 Apr 2023 Sonatrach Plausible
DZA_S_045Gas disposal facility 01 total 1,595 kg/h 11 Apr 2023 Sonatrach Plausible
DZA_S_086Gas disposal facility 01 total 2,795 kg/h 3 Apr 2023 Sonatrach Plausible
DZA_S_089Gas disposal facility 01 total 2,747 kg/h 3 Apr 2023 Sonatrach Plausible
DZA_S_051Transmission Compressor Station 01 total 1,613 kg/h 25 Mar 2023 Sonatrach Plausible
DZA_S_081Gas disposal facility 01 total 9,006 kg/h 16 Feb 2023 Sonatrach Plausible
DZA_S_158Flare 01 total 2,342 kg/h 16 Feb 2023 Sonatrach Plausible
DZA_S_099Gas disposal facility 01 total 9,683 kg/h 26 Dec 2022 Sonatrach Plausible
DZA_S_189O&G facility (generic) 01 total 831 kg/h 24 Dec 2022 Sonatrach Plausible
DZA_S_002O&G facility (generic) 01 total 696 kg/h 24 Dec 2022 Sonatrach Plausible
DZA_S_190Transmission Pipelines 01 total 591 kg/h 24 Dec 2022 Sonatrach Plausible
DZA_S_188Gas disposal facility 01 total 547 kg/h 24 Dec 2022 Sonatrach Plausible
DZA_S_056Gas disposal facility 01 total 889 kg/h 10 Sep 2022 Sonatrach Plausible
DZA_S_029O&G facility (generic) 01 total 13,072 kg/h 1 Sep 2022 Sonatrach Plausible
DZA_S_046Gas disposal facility 01 total 4,228 kg/h 18 Aug 2022 Sonatrach Plausible
DZA_S_173Gas disposal facility 01 total 1,528 kg/h 2 Jul 2021 Sonatrach Plausible