| DZA_S_012Gas disposal facility |
36464 en total |
10.437 kg/h |
12 oct 2024 |
Sonatrach Plausible |
| DZA_S_018Flare |
28111 en total |
18.550 kg/h |
3 abr 2025 |
Sonatrach Plausible |
| DZA_S_109Gas disposal facility |
2142 en total |
2.435 kg/h |
13 nov 2024 |
Sonatrach Plausible |
| DZA_S_010Flare |
1940 en total |
6.165 kg/h |
27 ene 2025 |
Sonatrach Plausible |
| DZA_S_152Gas disposal facility |
1414 en total |
3.365 kg/h |
17 abr 2025 |
Sonatrach Plausible |
| DZA_S_204Gas disposal facility |
1313 en total |
2.579 kg/h |
3 jul 2025 |
Sonatrach Plausible |
| DZA_S_222Gas disposal facility |
1220 en total |
3.265 kg/h |
12 ene 2025 |
Sonatrach Plausible |
| DZA_S_050Gas disposal facility |
1130 en total |
6.811 kg/h |
8 jul 2025 |
Sonatrach Plausible |
| DZA_S_098Flare |
1011 en total |
7.574 kg/h |
18 jun 2025 |
Sonatrach Plausible |
| DZA_S_070Gas disposal facility |
935 en total |
5.647 kg/h |
3 dic 2024 |
Sonatrach Plausible |
| DZA_S_008Flare · Persistente |
921 en total |
3.890 kg/h |
22 ago 2024 |
Sonatrach Plausible |
| DZA_S_013Flare |
815 en total |
3.529 kg/h |
19 sept 2024 |
Sonatrach Plausible |
| DZA_S_220Flare · Persistente |
88 en total |
2.454 kg/h |
3 dic 2024 |
Sonatrach Plausible |
| DZA_S_020Flare |
737 en total |
8.793 kg/h |
29 may 2025 |
Sonatrach Plausible |
| DZA_S_015Gas disposal facility |
710 en total |
2.181 kg/h |
24 dic 2024 |
Sonatrach Plausible |
| DZA_S_031Flare |
631 en total |
4.912 kg/h |
25 dic 2024 |
Sonatrach Plausible |
| DZA_S_110Gas disposal facility |
611 en total |
1.472 kg/h |
25 nov 2024 |
Sonatrach Plausible |
| DZA_S_019Flare |
514 en total |
4.873 kg/h |
10 feb 2025 |
Sonatrach Plausible |
| DZA_S_077Gas disposal facility |
59 en total |
1.737 kg/h |
3 dic 2024 |
Sonatrach Plausible |
| DZA_S_060Flare |
57 en total |
3.230 kg/h |
10 jul 2025 |
Sonatrach Plausible |
| DZA_S_101Flare |
55 en total |
3.971 kg/h |
26 abr 2025 |
Sonatrach Plausible |
| DZA_S_108Flare |
55 en total |
3.622 kg/h |
3 abr 2025 |
Sonatrach Plausible |
| DZA_S_120Gas disposal facility |
55 en total |
2.596 kg/h |
24 dic 2024 |
Sonatrach Plausible |
| DZA_S_016Landfill |
412 en total |
6.818 kg/h |
22 abr 2025 |
Aún sin atribuir |
| DZA_S_125Gas disposal facility |
44 en total |
6.238 kg/h |
13 jun 2025 |
Sonatrach Plausible |
| DZA_S_003Gas disposal facility |
44 en total |
3.859 kg/h |
8 jun 2025 |
Sonatrach Plausible |
| DZA_S_135Gas disposal facility |
44 en total |
5.148 kg/h |
14 feb 2025 |
Sonatrach Plausible |
| DZA_S_036Flare |
326 en total |
11.844 kg/h |
5 ago 2024 |
Sonatrach Plausible |
| DZA_S_030Flare |
316 en total |
6.774 kg/h |
29 sept 2024 |
Sonatrach Plausible |
| DZA_S_100Flare |
35 en total |
8.988 kg/h |
16 sept 2024 |
Sonatrach Plausible |
| DZA_S_014Gas disposal facility |
34 en total |
3.020 kg/h |
23 ene 2025 |
Sonatrach Plausible |
| DZA_S_205O&G facility (generic) |
33 en total |
2.432 kg/h |
15 jun 2025 |
Sonatrach Plausible |
| DZA_S_168Gas disposal facility |
33 en total |
4.665 kg/h |
27 abr 2025 |
Sonatrach Plausible |
| DZA_S_113Gas disposal facility |
33 en total |
10.591 kg/h |
26 mar 2025 |
Sonatrach Plausible |
| DZA_S_124Gas disposal facility |
33 en total |
7.204 kg/h |
31 ene 2025 |
Sonatrach Plausible |
| DZA_S_219Gas disposal facility |
33 en total |
7.781 kg/h |
8 nov 2024 |
Sonatrach Plausible |
| DZA_S_114Gas disposal facility |
33 en total |
5.138 kg/h |
6 oct 2024 |
Sonatrach Plausible |
| DZA_S_005Flare |
220 en total |
21.733 kg/h |
19 may 2025 |
Sonatrach Plausible |
| DZA_S_059Landfill |
210 en total |
3.943 kg/h |
6 oct 2024 |
Aún sin atribuir |
| DZA_S_021Chemical plant component |
25 en total |
7.869 kg/h |
14 ago 2024 |
Sonatrach Plausible |
| DZA_S_022Gas disposal facility |
24 en total |
4.029 kg/h |
23 abr 2025 |
Sonatrach Plausible |
| DZA_S_023O&G facility (generic) |
24 en total |
4.528 kg/h |
22 abr 2025 |
Sonatrach Plausible |
| DZA_S_137Pit |
24 en total |
1.338 kg/h |
12 feb 2025 |
Sonatrach Plausible |
| DZA_S_155Gas disposal facility |
23 en total |
9.919 kg/h |
17 abr 2025 |
Sonatrach Plausible |
| DZA_S_209Gas disposal facility |
22 en total |
2.121 kg/h |
19 jun 2025 |
Sonatrach Plausible |
| DZA_S_215Gas disposal facility |
22 en total |
3.084 kg/h |
17 jun 2025 |
Sonatrach Plausible |
| DZA_S_198Gas disposal facility |
22 en total |
4.458 kg/h |
17 jun 2025 |
Sonatrach Plausible |
| DZA_S_213Gas disposal facility |
22 en total |
3.534 kg/h |
15 jun 2025 |
Sonatrach Plausible |
| DZA_S_199Gas disposal facility |
22 en total |
2.586 kg/h |
14 jun 2025 |
Sonatrach Plausible |
| DZA_S_208Gas disposal facility |
22 en total |
1.900 kg/h |
9 jun 2025 |
Sonatrach Plausible |
| DZA_S_203Well pad |
22 en total |
8.110 kg/h |
1 jun 2025 |
Sonatrach Plausible |
| DZA_S_115Gas disposal facility |
22 en total |
2.902 kg/h |
8 abr 2025 |
Sonatrach Plausible |
| DZA_S_116Flare |
22 en total |
634 kg/h |
19 dic 2024 |
Sonatrach Plausible |
| DZA_S_119Gas disposal facility |
22 en total |
5.508 kg/h |
16 dic 2024 |
Sonatrach Plausible |
| DZA_S_118Gas disposal facility |
22 en total |
4.702 kg/h |
6 dic 2024 |
Sonatrach Plausible |
| DZA_S_043Gas disposal facility · Frecuente |
118 en total |
14.491 kg/h |
6 oct 2024 |
Sonatrach Plausible |
| DZA_S_011Pit |
111 en total |
10.545 kg/h |
6 oct 2024 |
Sonatrach Plausible |
| DZA_S_074Gas disposal facility |
19 en total |
1.478 kg/h |
5 oct 2024 |
Sonatrach Plausible |
| DZA_S_054Gas disposal facility |
18 en total |
8.168 kg/h |
22 jul 2024 |
Sonatrach Plausible |
| DZA_S_053Flare |
15 en total |
3.036 kg/h |
12 feb 2025 |
Sonatrach Plausible |
| DZA_S_027Flare |
14 en total |
7.597 kg/h |
18 abr 2025 |
Sonatrach Plausible |
| DZA_S_025Flare |
14 en total |
6.592 kg/h |
3 abr 2025 |
Sonatrach Plausible |
| DZA_S_039Gathering and boosting facilities |
14 en total |
5.355 kg/h |
27 ene 2025 |
Sonatrach Plausible |
| DZA_S_026Landfill · Persistente |
13 en total |
16.013 kg/h |
24 jul 2024 |
Aún sin atribuir |
| DZA_S_076Gas disposal facility |
12 en total |
1.866 kg/h |
25 may 2025 |
Sonatrach Plausible |
| DZA_S_096Gas disposal facility |
12 en total |
5.807 kg/h |
1 feb 2025 |
Sonatrach Plausible |
| DZA_S_040Gas disposal facility |
12 en total |
5.491 kg/h |
14 nov 2024 |
Sonatrach Plausible |
| DZA_S_216Gas disposal facility |
11 en total |
4.571 kg/h |
29 jun 2025 |
Sonatrach Plausible |
| DZA_S_214Gas disposal facility |
11 en total |
5.005 kg/h |
15 jun 2025 |
Sonatrach Plausible |
| DZA_S_207Gas disposal facility |
11 en total |
2.111 kg/h |
11 jun 2025 |
Sonatrach Plausible |
| DZA_S_210Gas disposal facility |
11 en total |
7.829 kg/h |
7 jun 2025 |
Sonatrach Plausible |
| DZA_S_211Gas disposal facility |
11 en total |
1.477 kg/h |
7 jun 2025 |
Sonatrach Plausible |
| DZA_S_197Transmission Pipelines |
11 en total |
2.380 kg/h |
19 may 2025 |
Sonatrach Plausible |
| DZA_S_196Gas disposal facility |
11 en total |
1.574 kg/h |
19 may 2025 |
Sonatrach Plausible |
| DZA_S_181Gas disposal facility |
11 en total |
7.865 kg/h |
17 may 2025 |
Sonatrach Plausible |
| DZA_S_154Gas disposal facility |
11 en total |
2.844 kg/h |
12 abr 2025 |
Sonatrach Plausible |
| DZA_S_151Petróleo y gas |
11 en total |
535 kg/h |
16 mar 2025 |
Sonatrach Plausible |
| DZA_S_141Gas disposal facility |
11 en total |
3.989 kg/h |
12 feb 2025 |
Sonatrach Plausible |
| DZA_S_133Gas disposal facility |
11 en total |
2.009 kg/h |
12 feb 2025 |
Sonatrach Plausible |
| DZA_S_134Gas disposal facility |
11 en total |
1.211 kg/h |
12 feb 2025 |
Sonatrach Plausible |
| DZA_S_140Gas disposal facility |
11 en total |
3.882 kg/h |
12 feb 2025 |
Sonatrach Plausible |
| DZA_S_123Gas disposal facility |
11 en total |
7.274 kg/h |
23 ene 2025 |
Sonatrach Plausible |
| DZA_S_221Gas disposal facility |
11 en total |
9.255 kg/h |
10 ene 2025 |
Sonatrach Plausible |
| DZA_S_150Petróleo y gas |
11 en total |
4.021 kg/h |
30 dic 2024 |
Sonatrach Plausible |
| DZA_S_121Pit |
11 en total |
642 kg/h |
23 dic 2024 |
Sonatrach Plausible |
| DZA_S_131Gas disposal facility |
11 en total |
1.007 kg/h |
19 dic 2024 |
Sonatrach Plausible |
| DZA_S_111Gas disposal facility |
11 en total |
2.453 kg/h |
6 nov 2024 |
Sonatrach Plausible |
| DZA_S_112Gas disposal facility |
11 en total |
2.967 kg/h |
31 oct 2024 |
Sonatrach Plausible |
| DZA_S_107Flare |
11 en total |
737 kg/h |
22 oct 2024 |
Sonatrach Plausible |
| DZA_S_105Gas disposal facility |
11 en total |
1.472 kg/h |
15 oct 2024 |
Sonatrach Plausible |
| DZA_S_106Gas disposal facility |
11 en total |
1.290 kg/h |
15 oct 2024 |
Sonatrach Plausible |
| DZA_S_103Gas disposal facility |
11 en total |
7.912 kg/h |
29 sept 2024 |
Sonatrach Plausible |
| DZA_S_176Transmission Pipelines |
11 en total |
1.456 kg/h |
18 ago 2024 |
Sonatrach Plausible |
| DZA_S_175Transmission Pipelines |
11 en total |
1.209 kg/h |
18 ago 2024 |
Sonatrach Plausible |
| DZA_S_017Transmission Pipelines |
11 en total |
3.156 kg/h |
6 ago 2024 |
Sonatrach Plausible |
| DZA_S_009Gas disposal facility |
11 en total |
2.718 kg/h |
21 jul 2024 |
Sonatrach Plausible |
| DZA_S_200Gas disposal facility |
11 en total |
1.700 kg/h |
21 jul 2024 |
Sonatrach Plausible |
| DZA_S_218Flare |
07 en total |
3.408 kg/h |
9 may 2024 |
Sonatrach Plausible |
| DZA_S_080Pipeline |
07 en total |
1.961 kg/h |
26 feb 2024 |
Sonatrach Plausible |
| DZA_S_174Gas disposal facility |
07 en total |
6.708 kg/h |
3 sept 2021 |
Sonatrach Plausible |
| DZA_S_028Flare |
06 en total |
7.760 kg/h |
14 feb 2024 |
Sonatrach Plausible |
| DZA_S_172Tank batteries |
06 en total |
8.500 kg/h |
21 oct 2021 |
Sonatrach Plausible |
| DZA_S_079Gas disposal facility |
05 en total |
4.800 kg/h |
20 abr 2024 |
Sonatrach Plausible |
| DZA_S_049Pit |
05 en total |
14.312 kg/h |
29 jun 2023 |
Sonatrach Plausible |
| DZA_S_085Gas disposal facility |
05 en total |
1.689 kg/h |
26 jun 2023 |
Sonatrach Plausible |
| DZA_S_063Gas disposal facility · Frecuente |
04 en total |
2.927 kg/h |
14 feb 2024 |
Sonatrach Plausible |
| DZA_S_082Gas disposal facility |
04 en total |
2.609 kg/h |
2 feb 2024 |
Sonatrach Plausible |
| DZA_S_062Pit |
04 en total |
4.010 kg/h |
10 oct 2023 |
Sonatrach Plausible |
| DZA_S_097Gathering and boosting facilities |
04 en total |
4.221 kg/h |
22 sept 2023 |
Sonatrach Plausible |
| DZA_S_037Transmission Pipelines |
04 en total |
17.440 kg/h |
31 ago 2023 |
Sonatrach Plausible |
| DZA_S_064Gas disposal facility |
04 en total |
3.535 kg/h |
26 ago 2023 |
Sonatrach Plausible |
| DZA_S_191Transmission Pipelines |
04 en total |
2.808 kg/h |
3 abr 2023 |
Sonatrach Plausible |
| DZA_S_167Flare |
04 en total |
3.140 kg/h |
14 dic 2022 |
Sonatrach Plausible |
| DZA_S_072Gas disposal facility |
03 en total |
2.929 kg/h |
4 abr 2024 |
Sonatrach Plausible |
| DZA_S_088Gas disposal facility |
03 en total |
5.952 kg/h |
5 ene 2024 |
Sonatrach Plausible |
| DZA_S_038Gas disposal facility |
03 en total |
7.892 kg/h |
18 ago 2023 |
Sonatrach Plausible |
| DZA_S_058Gas disposal facility |
03 en total |
5.138 kg/h |
12 jun 2023 |
Sonatrach Plausible |
| DZA_S_083Flare |
03 en total |
1.639 kg/h |
3 abr 2023 |
Sonatrach Plausible |
| DZA_S_102O&G facility (generic) |
03 en total |
4.006 kg/h |
30 sept 2021 |
Sonatrach Plausible |
| DZA_S_201Pit |
02 en total |
5.059 kg/h |
30 jun 2024 |
Sonatrach Plausible |
| DZA_S_024Landfill · Persistente |
02 en total |
27.716 kg/h |
12 jun 2024 |
Aún sin atribuir |
| DZA_S_001Flare |
02 en total |
2.523 kg/h |
7 jun 2024 |
Sonatrach Plausible |
| DZA_S_034Gas disposal facility |
02 en total |
7.865 kg/h |
20 abr 2024 |
Sonatrach Plausible |
| DZA_S_090Gas disposal facility |
02 en total |
5.396 kg/h |
4 abr 2024 |
Sonatrach Plausible |
| DZA_S_084Gas disposal facility |
02 en total |
7.346 kg/h |
31 mar 2024 |
Sonatrach Plausible |
| DZA_S_035Transmission Pipelines |
02 en total |
1.030 kg/h |
3 feb 2024 |
Sonatrach Plausible |
| DZA_S_073Gas disposal facility |
02 en total |
6.259 kg/h |
4 ene 2024 |
Sonatrach Plausible |
| DZA_S_065Gas disposal facility |
02 en total |
1.253 kg/h |
26 ago 2023 |
Sonatrach Plausible |
| DZA_S_091Gas disposal facility |
02 en total |
4.830 kg/h |
22 jun 2023 |
Sonatrach Plausible |
| DZA_S_032Transmission Pipelines |
01 en total |
1.758 kg/h |
4 may 2024 |
Sonatrach Plausible |
| DZA_S_044Gas disposal facility |
01 en total |
2.813 kg/h |
29 abr 2024 |
Sonatrach Plausible |
| DZA_S_087Gas disposal facility |
01 en total |
4.452 kg/h |
4 abr 2024 |
Sonatrach Plausible |
| DZA_S_069Gas disposal facility |
01 en total |
1.652 kg/h |
31 mar 2024 |
Sonatrach Plausible |
| DZA_S_041Gas disposal facility |
01 en total |
20.155 kg/h |
26 feb 2024 |
Sonatrach Plausible |
| DZA_S_042Pit |
01 en total |
2.459 kg/h |
26 feb 2024 |
Sonatrach Plausible |
| DZA_S_006Distribution Grid |
01 en total |
5.094 kg/h |
2 feb 2024 |
Sonatrach Plausible |
| DZA_S_048Transmission Pipelines |
01 en total |
12.263 kg/h |
6 dic 2023 |
Sonatrach Plausible |
| DZA_S_033Flare |
01 en total |
1.630 kg/h |
4 dic 2023 |
Sonatrach Plausible |
| DZA_S_068Flare |
01 en total |
1.252 kg/h |
29 nov 2023 |
Sonatrach Plausible |
| DZA_S_055Transmission Pipelines |
01 en total |
3.619 kg/h |
9 nov 2023 |
Sonatrach Plausible |
| DZA_S_057Gas disposal facility |
01 en total |
3.299 kg/h |
7 oct 2023 |
Sonatrach Plausible |
| DZA_S_095Gas disposal facility |
01 en total |
7.063 kg/h |
30 sept 2023 |
Sonatrach Plausible |
| DZA_S_078Gas disposal facility |
01 en total |
353 kg/h |
25 sept 2023 |
Sonatrach Plausible |
| DZA_S_075Pit |
01 en total |
1.341 kg/h |
26 ago 2023 |
Sonatrach Plausible |
| DZA_S_066Gas disposal facility |
01 en total |
1.904 kg/h |
29 jul 2023 |
Sonatrach Plausible |
| DZA_S_178Flare |
01 en total |
852 kg/h |
26 jun 2023 |
Sonatrach Plausible |
| DZA_S_071Gas disposal facility |
01 en total |
674 kg/h |
26 jun 2023 |
Sonatrach Plausible |
| DZA_S_061Flare |
01 en total |
13.949 kg/h |
22 jun 2023 |
Sonatrach Plausible |
| DZA_S_093Gas disposal facility |
01 en total |
7.675 kg/h |
7 jun 2023 |
Sonatrach Plausible |
| DZA_S_067Gas disposal facility |
01 en total |
8.721 kg/h |
6 jun 2023 |
Sonatrach Plausible |
| DZA_S_104Flare |
01 en total |
5.256 kg/h |
5 may 2023 |
Sonatrach Plausible |
| DZA_S_092Gas disposal facility |
01 en total |
2.930 kg/h |
23 abr 2023 |
Sonatrach Plausible |
| DZA_S_052Gas disposal facility |
01 en total |
2.049 kg/h |
12 abr 2023 |
Sonatrach Plausible |
| DZA_S_045Gas disposal facility |
01 en total |
1.595 kg/h |
11 abr 2023 |
Sonatrach Plausible |
| DZA_S_086Gas disposal facility |
01 en total |
2.795 kg/h |
3 abr 2023 |
Sonatrach Plausible |
| DZA_S_089Gas disposal facility |
01 en total |
2.747 kg/h |
3 abr 2023 |
Sonatrach Plausible |
| DZA_S_051Transmission Compressor Station |
01 en total |
1.613 kg/h |
25 mar 2023 |
Sonatrach Plausible |
| DZA_S_081Gas disposal facility |
01 en total |
9.006 kg/h |
16 feb 2023 |
Sonatrach Plausible |
| DZA_S_158Flare |
01 en total |
2.342 kg/h |
16 feb 2023 |
Sonatrach Plausible |
| DZA_S_099Gas disposal facility |
01 en total |
9.683 kg/h |
26 dic 2022 |
Sonatrach Plausible |
| DZA_S_189O&G facility (generic) |
01 en total |
831 kg/h |
24 dic 2022 |
Sonatrach Plausible |
| DZA_S_002O&G facility (generic) |
01 en total |
696 kg/h |
24 dic 2022 |
Sonatrach Plausible |
| DZA_S_190Transmission Pipelines |
01 en total |
591 kg/h |
24 dic 2022 |
Sonatrach Plausible |
| DZA_S_188Gas disposal facility |
01 en total |
547 kg/h |
24 dic 2022 |
Sonatrach Plausible |
| DZA_S_056Gas disposal facility |
01 en total |
889 kg/h |
10 sept 2022 |
Sonatrach Plausible |
| DZA_S_029O&G facility (generic) |
01 en total |
13.072 kg/h |
1 sept 2022 |
Sonatrach Plausible |
| DZA_S_046Gas disposal facility |
01 en total |
4.228 kg/h |
18 ago 2022 |
Sonatrach Plausible |
| DZA_S_173Gas disposal facility |
01 en total |
1.528 kg/h |
2 jul 2021 |
Sonatrach Plausible |